PROCESS FOR CONSTRUCTION SETOUT
MESH & STRINGS
- Identify at 'PRELIMINARY' phase what information is required for Construction Setout.
(Typically - Mesh Only for Rural Roads without Kerbing - Mesh & Setout Pegs for Urban & Rural with Kerbing)
- Setout Points & Excel Table (May not be required for Externally Constructed Projects).
- Design Mesh (Need to create both .DXF and .XML) (DXF. 2000)
- Create Mesh using Sincpac EXTRACTTINFACES to DXF
- Output>Export to LandXML
- 2D Design Strings (Save as 2010 .dxf)
(Create 3D Polylines using Sincpac 'Extract Corridor' command)
(Convert 3D Polylines to 2D with no extra Vertices using Sincpac 'Extract 2D' command) (Change Pruning Tolerance to 0.01 in 'Settings' first)
(Layer Names to be Descriptive - Ie. ST_WT, ST_CL)
DRAINAGE (Confirm with VRG & Construction)
- Provide Setout Points for JB's at Centre of JB with NO RL's
- Provide Setout Points for SEP's at 1.5m Offset from Both Front Faces with WT RL shown as Drainage Setout Point ('SEP WT' Description)